25 August 2006

Ramada construction

Here's some pics of the installation of the first post, the flagstone path with the posts and beams alongside, the first posts and beams up from the corner of the lot, me using the hammer drill to place the straps in the existing concrete pad for some posts, and a close-up of the wall caps for the outside beams.








No comments: